Making a solid-state reinforced concrete foundation plate is the first stage of construction and setup works, which takes 5-7 days.
|
|
|
Special German equipment is used for building foundations and basements. It allows evening the surfaces with high precision.
|
|
|
House structures are manufactured at the automatic factory during two days and then get transported to the construction spot in a special safety pack. |
|
|
Wall coverings and roofing slate setup is finished within 1-3 days.
Afterwards, facade and roof finishing works are conducted.
|
|
|
After that, engineer works for installing and activating inner heating system, water and power supply, conditioning and sewerage systems are fulfilled. Setting up the engineer systems takes about a week.
|
|