Costs of cottages, country houses and panel frame houses
|
|
PRICE OF BASIC COTTAGE MODEL including
- foundation
- inner engineering networks
- exterior finishing works
- high quality window and balcony blocks
- etrance doors
from Rouble for 1 м2
|
TIME OF WORK - from 1 month |
PLEASE NOTE!
This website is of informational nature only and is not public offer, defined by the article 437 of the Civil Code of the Russia Federation. To get detailed information about the prices, please contact
sales managers of HAUS-KONZEPT Sodruzhestvo.
|
|
Details:
LIST OF CONSRUCTION AND ENGINEERING WORKS, BASIC CONSTRUCTION MODEL:
- foundations - strip ferroconcrete solid-cast or solid foundation plate,
- construction structures set: wall panels, floor and ceiling panels, roof panels - wooden frame of glued wood, basalt lagging, OSB plate, vapor seal, expanded polystyrene, drywall, plaster, the width of the panels is 270-380mm,
- roof, drainpipes - metal tile produced in Germany or Finland.
- window and door blocks - wooden double-glazed windows, fitting of ROTO or MACO, construction casting of galvanized steel,
- entrance doors - shield painted doors with locks and handles,
- exterior facade - style plastering,
- inner finsihing works - drywall, floors concerete covering
- engineering works: inner layout of heating system, water supply system, canalization system, ventilation system, inner electricity system installment.
|
| LIST OF WORKS |
| Foundations |
Construction of foundations and porches |
Manufacture, delivery and assembly of house constructs |
Manufacture of construction structures sets
Set delivery to the construction spot and structures mounting
Hollow fill and facing works
Covering walls and roof with drywall
Wiring (exluding installing sockets and switches)
|
| Roof |
Metal tile roof erection
Drainpipes mounting |
| Special works |
Heating: inner pipe laying, heating radiators (Italy)
Water-supply and canalization: inner pipe laying without connection to plumbing or exterior networks
Ventilation setting
Cement covering of the ground and 1st floor
|
|
|
|
|